Is there a checklist for installing a Note Array?
Yes. Our Note Array Site Checklist takes your installer, electrician and IT team through every stage, from planning the wall to activating the array. Print it, fill in the project details, and work through it together before the Notes go up.
What it covers
|
Stage |
What happens |
Read more |
|---|---|---|
|
1. Plan the installation |
Confirm the array size and where it goes, and share this guide with everyone involved |
|
|
2. Prepare the wall |
Check the wall can carry the full array, with room above the top row |
|
|
3. Power every Note |
Fix outlet locations before the wall is closed, and size the circuit for the full array |
How many Notes can share a circuit? and How do I plan power outlets for a Note Array? |
|
4. Get the network ready |
Choose Ethernet or Wi-Fi and run cables before mounting |
|
|
5. Save every template |
Keep the template from every box and hand them all to your installer |
|
|
6. Install the Notes |
Hang the Notes from the bottom row up |
|
|
7. Let the Notes update |
Leave every Note powered while it downloads updates |
|
|
8. Create the array |
Group the Notes on the web and send test messages |
|
|
9. Activate the array |
Our team switches on Note Array Software for you |
Want a second look at your plan?
Send us your array configuration, the installation date and a photo or drawing of the wall at services@vestaboard.com. We'll go through it with you and flag anything worth sorting out before work starts.